Suelo Solar

CATALOG ADVERTISING SUELOSOLAR

Budget Proposal

Reference: 2044
PROFESSIONAL EMITTER:



To bid must register
  
REQUESTING CLIENT:
Budget Data:  6/20/2013
 

Phases of interest : Project, Turnkey

Object : Hot Water, Solar heating and cooling, Pool water conditioning, Auto Power Consumption / Net Metering

BUILDING

Type of Building Semi-Detached  Use of Building Everyday 
Number of Users 15 Persons Number of Floors 2 Floors
Area 550 m² Age of Building
Level of Isolation Very good  

ROOF-TOP

Under Construction :   Area of Roof : 200 m²
Resistance/maximum Load : 25 Kg/cm² Orientation of Ridge :
Slope : -- Condition : Excellent
Material of Roof : Others Age of Roof : --
Plans of Architect : Memory of Calculation of Structure :
Notes :
La superficie es plana y está enlosada.

HOT WATER

Current Conventional energy Electricity Space to place the installation  
Se ubicaría en azotea 
Professional reviews:

SUBTOTAL...................


SOLAR HEATING AND COOLING

Present System Boiler Room Sí/Yes  
Desired System System of help
La casa esta reformada y ampliada y tiene dos chimeneas.
Professional reviews:

SUBTOTAL...................

SWIMMING POOL

Type of Bath Outside Period of use Summer  
Perimeter 20 Area 24
Depth Volume Swimming Pool 34000 lts.
Foreseen location of collectors Floor Foreseen location of collectors
La azotea de la casa tiene 200 metros y es plana. La piscina se colocará (estamos en obras) en un patio de 800 m2
Professional reviews

SUBTOTAL...................


AUTO POWER CONSUMPTION / NET METERING

System of help Electrical Current Area 500 m²  
Light Points 30   -- Refrigerator 1 units  --
TV 6 units  -- Warhing Machine 1 units  --
Computers 3 units -- Dryer -- --
Air Conditioning -- --  Dishwasher 1 units -- 
Heaters 4 units --  VE -- --
Others -- -- Hi-Fi -- --
Contracted / projected capacity 14 kW. Annual electricity consumption --
La casa es reformada y ampliada. Actualmente tiene contratada 3,45Kw. No hemos vivido con las nuevas condiciones. Los puntos de luz van todos con lámparas de bajo consumo.
Professional reviews:

SUBTOTAL...................

GROSS TOTAL...................

TAXES :   
  % .......
   

TOTAL BUDGET .......

METHOD OF PAYMENT:



NOTES

acompaño planos en dwg
 

PROFESSIONAL REVIEWS    

(Remaining: characters

Usuario No Abonado
>> Subscribe to the <<
order to answer this and other budget requests